Factory plan results
Reinforced Iron Plate at 10 per minute
Production overview
Calculated machines, raw materials, power, and transport capacity.
Validation
Bottlenecks, missing paths, limits, and risky settings.
- Circular dependency detected at Plastic; remaining demand treated as external input.
- Circular dependency detected at Rubber; remaining demand treated as external input.
Production stages
Rates are per minute. Fractional machines are valid planning values.
| Output / recipe | Machine | Output | Machines | Clock | Utilization | Power | Inputs |
|---|---|---|---|---|---|---|---|
| Reinforced Iron Plate Adhered Iron Plate Tier 5 |
Assembler | 10 | 2.667 exact 2.667 |
100% | 100% |
40 MW | Iron Plate: 30 Rubber: 10 |
| Iron Plate Steel Coated Plate Tier 5 |
Assembler | 30 | 0.667 exact 0.667 |
100% | 100% |
10 MW | Steel Ingot: 5 Plastic: 3.333 |
| Rubber Recycled Rubber Tier 5 |
Refinery | 11.667 | 0.194 exact 0.194 |
100% | 100% |
5.833 MW | Plastic: 5.833 Fuel: 5.833 |
| Steel Ingot Compacted Steel Ingot Tier 3 |
Foundry | 5 | 0.133 exact 0.133 |
100% | 100% |
2.133 MW | Iron Ore: 3 Compacted Coal: 1.5 |
| Plastic Recycled Plastic Tier 5 |
Refinery | 8.333 | 0.139 exact 0.139 |
100% | 100% |
4.167 MW | Rubber: 4.167 Fuel: 4.167 |
| Fuel Fuel Tier 5 |
Refinery | 10 | 0.25 exact 0.25 |
100% | 100% |
7.5 MW | Crude Oil: 15 |
| Compacted Coal Compacted Coal Tier 3 |
Assembler | 1.5 | 0.06 exact 0.06 |
100% | 100% |
0.9 MW | Coal: 1.5 Sulfur: 1.5 |
Raw resources and extraction
Node estimates use the selected miner, purity, and miner clock.
| Resource | Required / min | Extractor | Rate per node | Exact nodes | Rounded nodes | Configured limit |
|---|---|---|---|---|---|---|
| Iron Ore | 3 | Miner Mk.3 | 240 | 0.013 | 1 | Unlimited |
| Coal | 1.5 | Miner Mk.3 | 240 | 0.006 | 1 | Unlimited |
| Sulfur | 1.5 | Miner Mk.3 | 240 | 0.006 | 1 | Unlimited |
| Crude Oil | 15 | Oil Extractor | 120 | 0.125 | 1 | Unlimited |
External or unresolved inputs
| Item | Rate / min | Reason |
|---|---|---|
| Rubber | 2.5 | Existing supply, missing recipe, or cycle boundary |
| Plastic | 0.833 | Existing supply, missing recipe, or cycle boundary |
Power plan
Includes production buildings and extraction equipment.
| Machine type | Exact count | Rounded count | Base power each |
|---|---|---|---|
| Assembler | 3.393 | 4 | 15 MW |
| Refinery | 0.583 | 1 | 30 MW |
| Foundry | 0.133 | 1 | 16 MW |
| Oil Extractor | 0.125 | 1 | 40 MW |
| Miner Mk.3 | 0.025 | 1 | 30 MW |
Logistics and transport
Capacity checks for belts, pipes, and long-distance transportation.
| Stage output | Transport medium | Flow | Capacity per line | Exact lines | Required lines | Utilization of last line |
|---|---|---|---|---|---|---|
| Reinforced Iron Plate | Conveyor Mk.5 | 10 | 780 | 0.013 | 1 | 1.3% |
| Iron Plate | Conveyor Mk.5 | 30 | 780 | 0.038 | 1 | 3.8% |
| Rubber | Conveyor Mk.5 | 11.667 | 780 | 0.015 | 1 | 1.5% |
| Steel Ingot | Conveyor Mk.5 | 5 | 780 | 0.006 | 1 | 0.6% |
| Plastic | Conveyor Mk.5 | 8.333 | 780 | 0.011 | 1 | 1.1% |
| Fuel | Pipeline Mk.2 | 10 | 600 | 0.017 | 1 | 1.7% |
| Compacted Coal | Conveyor Mk.5 | 1.5 | 780 | 0.002 | 1 | 0.2% |
Byproducts and surplus
Review every secondary output to prevent backed-up machines.
| Item | Produced / min | Configured action | Remaining surplus / min | Risk |
|---|---|---|---|---|
| Polymer Resin | 7.5 | Reuse | 7.5 | Managed |
All calculated surplus
| Item | Surplus / min | Per hour |
|---|---|---|
| Polymer Resin | 7.5 | 450 |
Factory construction list
Building ingredients use rounded-up machine counts.
| Material | Estimated quantity | Checklist |
|---|---|---|
| Steel Pipe | 39 | |
| Copper Sheet | 16 | |
| Cable | 11 | |
| Encased Industrial Beam | 1 | |
| Motor | 95 | |
| Reinforced Iron Plate | 4 | |
| Rotor | 3 | |
| Concrete | 2 | |
| Fused Modular Frame | 15 | |
| Modular Frame | 1 | |
| Portable Miner | 9 | |
| Turbo Motor | 9 |
Buildings
| Building | Exact count | Build count |
|---|---|---|
| Assembler | 3.393 | 4 |
| Refinery | 0.583 | 1 |
| Foundry | 0.133 | 1 |
| Oil Extractor | 0.125 | 1 |
| Miner Mk.3 | 0.025 | 1 |
Production flow diagram
Drag to pan. Use the mouse wheel to zoom.
Factory charts
Visual comparison of machine power and raw-resource demand.
Power by production stage
Raw resources
Factory configuration
Change any planning assumption and recalculate the complete production chain.